Kamis, 25 Januari 2024

INTRODUCTION POD, WP&B & AFE

Plan of Development is the key point in Oil & Gas Business of Indonesia Upstream Oil and Gas Industry. POD is a guideline for KKKS to operate their project. There is a planning program that describe of project activity during the contract. KKKS should construct the detail of program activities and budgeting (WP&B) and Financial Authorization (AFE). In the Indonesia PSC Term, POD, WP&B and AFEis the integratedaspect that every KKKS should propose to SKKMIGAS. Therefore, between SKKMIGAS and KKKSshould have the same perception all about aspect of POD, WP&B and AFE especially about the basic principle, mechanism & procedure, system and operational guidance. read: Strategic Talent Management In The Oil and Gas Industry


Course Content

  • Overview of Upstream Oil & Gas Industry
  • The PSC term and conditions
  • PSC Accounting Principle
  • POD:
    • Clasification of POD
    • POD Content
  • WP&B:
    • Definition of WP&B
    • Budget Preparation: Explanation & Developing Budget Schedule 1 – 17
  • AFE:
    • Definition of AFE
    • Activity Classification
    • Explanation Budget Schedule 18 – 24
    • Closed Out AFE

 

 

Tidak ada komentar:

Posting Komentar